Delivery / Pleasure Sail to Navy Marina
Event Add to my Calendar
View Calendar
When:
April 18, 2022 @ 1:30 pm
2022-04-18T13:30:00-04:00
2022-04-18T13:45:00-04:00
Boat Location:
Borden Light Marina
1 Ferry St
Fall River, MA 02721
USA
The plan is to deliver Vento Solare to the Navy Marina from Borden Light Marina in Fall River. On Sunday night I'll check the weather and if it looks good will confirm.
The trip is 15.1nm and should take about 2.5 to 3 hours. I will have some liquid refreshments onboard.
Everyone meet 12:45 pm at the O'Club parking lot to be driven to Borden Light Marina. At the end of the trip we'll need someone to drive to Borden Light and retrieve the car left there.
Be at Borden Light Marina - Mon April 18th @ 1:30PM EDT
Post # 4859
Permanent link to this article: https://vs.j109.org/event/delivery-pleasure-sail-to-navy-marina/
Recent Comments
This photo from Block Island Steve
98TH CONANICUT YACHT CLUB AROUND THE ISLAND RACE
Great time on the water today and after at the CYC awards party. Third place finish in a class with 11 boats.
These pictures taken by Block Island Steve after the start of the Ida Lewis Distance Race.
Henry & Matt Trimming
Henry Trimming
Elena Trimming
The 2025 ILDR was a light air challenge for the Vento Solare crew. Pia, Elena & Henry made up 50% of the crew to qualify as a youth entry. They were joined by Peter, Matt & Bill. The crew was recognized at the awards ceremony with the 1st place Youth trophy and 3rd of 8 in the Coronet class.
Youth Trophy 1st place presented to Vento Solare crew
3rd of 8 boats in Coronet class
Tristan Mouligne captured this picture from the Class 40 Res Potentia on Saturday morning. Vento Solare is limping into Newport with the spinnaker wrapped around the headstay. This occurred when a letterbox douse was attempted the evening before while trying to round R32 off Gay Head, Marthas Vineyard. The spinnaker became badly wrapped around the headstay and jib while unfurling the jib for a letterbox douse. Sarah was hoisted up the mast 1/3 of the way in the dark to try and unwrap the spinnaker but was unsuccessful. Thus the decision was made to retire and motor back to Newport. We tied up to a mooring at Coasters Harbor and hoisted Sarah to the top. The spinnaker head was fouled under the headstay and caught on the upper swivel, preventing the furler from moving in either direction. Sarah disconnected the spinnaker halyard and was able to unwrap the spinnaker. Once that was done we were able to unwind the rest of the spinnaker without damage, and completely unfurl, then refurl the jib.